ITAC Assessment: BS0142
ITAC logo
ITAC Assessment: BS0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Apple Sauce
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 350,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,071 11,619,897
kWh
Electricity Demand $152,780 22,760
kW-mo/yr
Electricity Fees $107,983 -
Natural Gas $141,313 44,481
MMBtu
TOTAL YEARLY COSTS $857,147
RECOMMENDED SAVINGS* $8,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $1,675 $335 $649
16,567
kWh
- $1,026
-
MMBtu
02 2.4133: Use most efficient type of electric motors $3,550 $6,370 $3,019
77,088
kWh
$531
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $2,266 $1,811 $2,266
57,847
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $53 $75 $36
924
kWh
$17
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $888 $1,944 $646
16,500
kWh
$242
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,432 $10,535 $6,616
168,926
kWh
$790
-
kW-mo/yr
$1,026
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs