Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Particle Board
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 534,567
ft2
Annual Production 130,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $788,034 15,620,046
kWh
Electricity Demand $55,811 28,268
kW-mo/yr
Electricity Fees $117,444 -
Natural Gas $36,879 8,650
MMBtu
Waste Disposal Costs
Water Usage $9,473 3,644
Tgal
TOTAL YEARLY COSTS $1,007,641
RECOMMENDED SAVINGS* $56,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,094 $50 $2,896
57,925
kWh
$198
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $903 $3,300 $744
14,878
kWh
$159
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $68 $55 $68
1,360
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,521 $1,100 $1,423
28,463
kWh
$98
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,407 $70,150 $13,641
269,382
kWh
$766
-
kW-mo/yr
- - -
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $36,736 $27,300 - - $20,025
-
MMBtu
$6,631
-
Tgal
$10,080
TOTAL RECOMMENDED $56,729 $101,955 $18,772
372,008
kWh
$1,221
-
kW-mo/yr
$20,025
-
MMBtu
$6,631
-
Tgal
$10,080
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs