| Assessment Year | 2020 |
|---|---|
| Principal Product | Precision Metal Parts |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $500 k to 1M |
| # of Employees | 47 |
| Plant Area |
42,500
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,533 | 1,171,680 |
kWh
|
$0.049 |
| Electricity Demand | $18,269 | 3,353 |
kW-mo/yr
|
$5.45 |
| Electricity Fees | $1,896 | - |
|
- |
| Natural Gas | $7,683 | 1,520 |
MMBtu
|
$5.05 |
| LPG | $28 | 13 |
MMBtu
|
$2.12 |
| TOTAL YEARLY COSTS | $85,409 | |||
| RECOMMENDED SAVINGS* | $17,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,313 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,952 | $4,513 |
$4,952
100,859
kWh
|
- | - | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $466 | $319 |
$160
3,259
kWh
|
- |
$306
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,058 | - |
$1,058
21,550
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,837 | $642 |
$2,379
48,443
kWh
|
$458
-
kW-mo/yr
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,475 | $2,808 |
$7,475
152,240
kWh
|
- | - | |
| 06 | 2.7233: Use properly designed and sized hvac equipment | $479 | $1,149 |
$479
9,760
kWh
|
- | - | |
| TOTAL RECOMMENDED | $17,267 | $9,431 |
$16,503
336,111
kWh
|
$458
-
kW-mo/yr
|
$306
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,313 | $5,474 |
$8,549
174,111
kWh
|
$458
-
kW-mo/yr
|
$306
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs