ITAC Assessment: BS0140
ITAC logo
ITAC Assessment: BS0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Precision Metal Parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 47
Plant Area 42,500
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,533 1,171,680
kWh
Electricity Demand $18,269 3,353
kW-mo/yr
Electricity Fees $1,896 -
Natural Gas $7,683 1,520
MMBtu
LPG $28 13
MMBtu
TOTAL YEARLY COSTS $85,409
RECOMMENDED SAVINGS* $17,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,313

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,952 $4,513 $4,952
100,859
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $466 $319 $160
3,259
kWh
- $306
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,058 - $1,058
21,550
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,837 $642 $2,379
48,443
kWh
$458
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,475 $2,808 $7,475
152,240
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $479 $1,149 $479
9,760
kWh
- -
TOTAL RECOMMENDED $17,267 $9,431 $16,503
336,111
kWh
$458
-
kW-mo/yr
$306
-
MMBtu
TOTAL IMPLEMENTED $9,313 $5,474 $8,549
174,111
kWh
$458
-
kW-mo/yr
$306
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs