ITAC Assessment: BS0117
ITAC logo
ITAC Assessment: BS0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 440,000,000
pieces
Production Hrs. Annual 7,986
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,847 5,784,620
kWh
Electricity Demand $59,295 10,325
kW-mo/yr
Electricity Fees $8,633 -
Natural Gas $259,563 48,974
MMBtu
TOTAL YEARLY COSTS $739,338
RECOMMENDED SAVINGS* $43,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4112: Install soft-start to eliminate nuisance trips $32,085 $5,600 - $32,085
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $413 $1,047 - - $413
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,373 $350 $2,136
30,083
kWh
$237
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,573 $1,650 $5,573
70,497
kWh
- -
05 2.2522: Isolate hot or cold equipment $3,322 $502 - - $3,322
-
MMBtu
TOTAL RECOMMENDED $43,765 $9,149 $7,709
100,580
kWh
$32,322
-
kW-mo/yr
$3,735
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs