ITAC Assessment: GT0874
ITAC logo
ITAC Assessment: GT0874
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Needle Roller Bearings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 267,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,872 21,661,909
kWh
Electricity Demand $636,225 42,415
kW-mo/yr
Electricity Fees $39,237 -
Natural Gas $378,618 67,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $511,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,133 $1,250 $643
23,827
kWh
$490
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $1,632 - $926
34,302
kWh
$706
-
kW-mo/yr
-
03 2.2515: Use optimum thickness insulation $53,185 $6,187 $53,185
1,969,782
kWh
- -
04 2.3191: Use demand controller or load shedder $6,159 $2,883 $6,159
228,125
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $19,038 $20,250 $19,038
705,120
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,115 $38,366 $4,576
169,481
kWh
$5,539
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $27,744 $119,989 $12,552
464,875
kWh
$15,192
-
kW-mo/yr
-
08 2.7273: Install desiccant humidity control system $392,100 $177,900 $71,880
2,662,143
kWh
$61,720
-
kW-mo/yr
$258,500
-
MMBtu
TOTAL RECOMMENDED $511,106 $366,825 $168,959
6,257,655
kWh
$83,647
-
kW-mo/yr
$258,500
-
MMBtu
TOTAL IMPLEMENTED $35,036 $124,122 $19,354
716,827
kWh
$15,682
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs