| Assessment Year | 2016 |
|---|---|
| Principal Product | Dimensional Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $50 M to 100M |
| # of Employees | 72 |
| Plant Area |
85,000
ft2
|
| Annual Production | 65,000
thousand feet
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $280,439 | 4,584,685 |
kWh
|
$0.061 |
| Electricity Demand | $64,839 | 11,588 |
kW-mo/yr
|
$5.60 |
| Wood | $259,584 | 124,800 |
MMBtu
|
$2.08 |
| TOTAL YEARLY COSTS | $604,862 | |||
| RECOMMENDED SAVINGS* | $22,249 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,261 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,089 | $4,550 |
$6,031
98,548
kWh
|
$1,058
-
kW-mo/yr
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,309 | $150 |
$10,309
169,005
kWh
|
- | - | |
| 03 | 2.2122: Install / repair insulation on condensate lines | $72 | $311 | - | - |
$72
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,916 | $80 |
$3,205
52,364
kWh
|
$711
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $462 | $15 |
$308
5,037
kWh
|
$154
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $401 | $550 |
$401
6,570
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,249 | $5,656 |
$20,254
331,524
kWh
|
$1,923
-
kW-mo/yr
|
$72
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,261 | $5,265 |
$17,049
279,160
kWh
|
$1,212
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs