IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product User Interface
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3575: Computer Terminals
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 49,164
ft2
Annual Production 96,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,072 524,510
kWh
Electricity Demand $8,998 1,820
kW-mo/yr
Electricity Fees $403 -
Natural Gas $9,123 1,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $99 $576 $99
1,728
kWh
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $159 $916 $(-7.0)
(-117)
kWh
- - $166
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $879 $503 - - - $879
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $975 $1,145 $716
12,492
kWh
$259
-
kW-mo/yr
- -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $198 $374 $198
3,448
kWh
- - -
06 2.8123: Pay utility bills on time $33 - - - $33 -
TOTAL RECOMMENDED $2,343 $3,514 $1,006
17,551
kWh
$259
-
kW-mo/yr
$33 $1,045
-
MMBtu
TOTAL IMPLEMENTED $2,151 $2,598 $1,013
17,668
kWh
$259
-
kW-mo/yr
- $879
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs