| Assessment Year | 2015 |
|---|---|
| Principal Product | Lumber (Board Ft.) |
| NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 67 |
| Plant Area |
2,479,339
ft2
|
| Annual Production | 80,000
thousand feet
|
| Production Hrs. Annual | 4,200
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $886,545 | 16,776,812 |
kWh
|
$0.053 |
| Electricity Demand | $263,768 | 33,452 |
kW-mo/yr
|
$7.88 |
| Wood | $425 | 142 |
MMBtu
|
$3.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,711 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,953 | $9,195 |
$1,361
25,688
kWh
|
$591
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,672 | $422 |
$2,220
41,890
kWh
|
$452
-
kW-mo/yr
|
- | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $576 | $500 |
$311
5,873
kWh
|
$265
-
kW-mo/yr
|
- | |
| 04 | 2.2122: Install / repair insulation on condensate lines | $273 | $739 | - | - |
$273
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,259 | $18,330 |
$3,556
67,094
kWh
|
$1,703
-
kW-mo/yr
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,480 | $750 |
$2,480
46,800
kWh
|
- | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,497 | $220 |
$9,497
179,192
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,711 | $30,156 |
$19,426
366,537
kWh
|
$3,011
-
kW-mo/yr
|
$273
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs