ITAC Assessment: BS0058
ITAC logo
ITAC Assessment: BS0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Lumber (Board Ft.)
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 2,479,339
ft2
Annual Production 80,000
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $886,545 16,776,812
kWh
Electricity Demand $263,768 33,452
kW-mo/yr
Wood $425 142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,953 $9,195 $1,361
25,688
kWh
$591
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,672 $422 $2,220
41,890
kWh
$452
-
kW-mo/yr
-
03 2.4131: Size electric motors for peak operating efficiency $576 $500 $311
5,873
kWh
$265
-
kW-mo/yr
-
04 2.2122: Install / repair insulation on condensate lines $273 $739 - - $273
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,259 $18,330 $3,556
67,094
kWh
$1,703
-
kW-mo/yr
-
06 2.6212: Turn off equipment during breaks, reduce operating time $2,480 $750 $2,480
46,800
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $9,497 $220 $9,497
179,192
kWh
- -
TOTAL RECOMMENDED $22,711 $30,156 $19,426
366,537
kWh
$3,011
-
kW-mo/yr
$273
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs