Assessment Year | 2015 |
---|---|
Principal Product | Lumber (Board Ft.) |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
2,479,339
ft2
|
Annual Production | 80,000
thousand feet
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $886,545 | 16,776,812 |
kWh
|
$0.053 |
Electricity Demand | $263,768 | 33,452 |
kW-mo/yr
|
$7.88 |
Wood | $425 | 142 |
MMBtu
|
$3.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,711 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,953 | $9,195 |
$1,361
25,688
kWh
|
$591
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,672 | $422 |
$2,220
41,890
kWh
|
$452
-
kW-mo/yr
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $576 | $500 |
$311
5,873
kWh
|
$265
-
kW-mo/yr
|
- | |
04 | 2.2122: Install / repair insulation on condensate lines | $273 | $739 | - | - |
$273
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,259 | $18,330 |
$3,556
67,094
kWh
|
$1,703
-
kW-mo/yr
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,480 | $750 |
$2,480
46,800
kWh
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,497 | $220 |
$9,497
179,192
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,711 | $30,156 |
$19,426
366,537
kWh
|
$3,011
-
kW-mo/yr
|
$273
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs