ITAC Assessment: BS0050
ITAC logo
ITAC Assessment: BS0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 300,000
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,136 2,550,080
kWh
Electricity Demand $36,370 4,951
kW-mo/yr
Natural Gas $24,645 2,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $89,269 $87,200 $79,068
1,013,697
kWh
$10,201
-
kW-mo/yr
02 2.7135: Install occupancy sensors $750 $660 $750
9,617
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $143 $60 $126
1,616
kWh
$17
-
kW-mo/yr
TOTAL RECOMMENDED $90,162 $87,920 $79,944
1,024,930
kWh
$10,218
-
kW-mo/yr
TOTAL IMPLEMENTED $90,162 $87,920 $79,944
1,024,930
kWh
$10,218
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs