| Assessment Year | 2014 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $50 M to 100M |
| # of Employees | 14 |
| Plant Area |
3,049,200
ft2
|
| Annual Production | 125,000,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,207,482 | 22,768,434 |
kWh
|
$0.053 |
| Electricity Demand | $259,754 | 49,121 |
kW-mo/yr
|
$5.29 |
| Natural Gas | $13,634 | 1,936 |
MMBtu
|
$7.04 |
| Wood | $1,950,000 | 654,898 |
MMBtu
|
$2.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $105,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $98,208 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,312 | $58,240 |
$21,282
418,794
kWh
|
$4,110
-
kW-mo/yr
|
- | $920 | - | |
| 02 | 2.7135: Install occupancy sensors | $3,053 | $30 |
$3,053
40,241
kWh
|
- | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $876 | $2,756 |
$771
14,452
kWh
|
$105
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,860 | $9,526 |
$5,794
109,325
kWh
|
$66
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $338 | $300 |
$338
6,386
kWh
|
- | - | - | - | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,235 | $752 |
$8,235
155,379
kWh
|
- | - | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $401 | $922 |
$354
6,663
kWh
|
$48
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.2113: Repair or replace steam traps | $25,901 | $50,324 | - | - |
$15,626
-
MMBtu
|
- |
$10,275
-
Tgal
|
|
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,395 | $84 |
$7,974
156,947
kWh
|
$1,421
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.2136: Install / repair insulation on steam lines | $91 | $341 | - | - |
$91
-
MMBtu
|
- | - | |
| 11 | 2.2511: Insulate bare equipment | $581 | $1,533 | - | - |
$581
-
MMBtu
|
- | - | |
| 12 | 2.2511: Insulate bare equipment | $723 | $3,015 | - | - |
$723
-
MMBtu
|
- | - | |
| 13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,944 | $70,000 |
$21,092
394,375
kWh
|
$2,852
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $105,710 | $197,823 |
$68,892
1,302,562
kWh
|
$8,602
-
kW-mo/yr
|
$17,021
-
MMBtu
|
$920 |
$10,275
-
Tgal
|
||
| TOTAL IMPLEMENTED | $98,208 | $183,449 |
$62,760
1,186,851
kWh
|
$8,536
-
kW-mo/yr
|
$15,717
-
MMBtu
|
$920 |
$10,275
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs