ITAC Assessment: BS0046
ITAC logo
ITAC Assessment: BS0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 14
Plant Area 3,049,200
ft2
Annual Production 125,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,207,482 22,768,434
kWh
Electricity Demand $259,754 49,121
kW-mo/yr
Natural Gas $13,634 1,936
MMBtu
Wood $1,950,000 654,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,312 $58,240 $21,282
418,794
kWh
$4,110
-
kW-mo/yr
- $920 -
02 2.7135: Install occupancy sensors $3,053 $30 $3,053
40,241
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $876 $2,756 $771
14,452
kWh
$105
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,860 $9,526 $5,794
109,325
kWh
$66
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $338 $300 $338
6,386
kWh
- - - -
06 2.6212: Turn off equipment during breaks, reduce operating time $8,235 $752 $8,235
155,379
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $401 $922 $354
6,663
kWh
$48
-
kW-mo/yr
- - -
08 2.2113: Repair or replace steam traps $25,901 $50,324 - - $15,626
-
MMBtu
- $10,275
-
Tgal
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,395 $84 $7,974
156,947
kWh
$1,421
-
kW-mo/yr
- - -
10 2.2136: Install / repair insulation on steam lines $91 $341 - - $91
-
MMBtu
- -
11 2.2511: Insulate bare equipment $581 $1,533 - - $581
-
MMBtu
- -
12 2.2511: Insulate bare equipment $723 $3,015 - - $723
-
MMBtu
- -
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,944 $70,000 $21,092
394,375
kWh
$2,852
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $105,710 $197,823 $68,892
1,302,562
kWh
$8,602
-
kW-mo/yr
$17,021
-
MMBtu
$920 $10,275
-
Tgal
TOTAL IMPLEMENTED $98,208 $183,449 $62,760
1,186,851
kWh
$8,536
-
kW-mo/yr
$15,717
-
MMBtu
$920 $10,275
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs