ITAC Assessment: BS0034
ITAC logo
ITAC Assessment: BS0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Airport Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 312
Plant Area 215,000
ft2
Annual Production 468
units
Production Hrs. Annual 2,125
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,043 3,416,400
kWh
Electricity Demand $188,902 12,013
kW-mo/yr
Electricity Fees $4,344 -
Natural Gas $190,010 43,692
MMBtu
LPG $17,537 988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $10,406 $20,000 - - $10,406 -
02 2.4322: Use or replace with energy efficient substitutes $74,212 $31,860 $24,162
676,372
kWh
$50,050
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,966 $45,410 $18,377
514,429
kWh
- - $35,589
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $14,073 $49,835 $(-222.8)
(-6,237)
kWh
$(-490.4)
-
kW-mo/yr
- $14,786
-
MMBtu
05 2.6218: Turn off equipment when not in use $7,083 $304 - - - $7,083
-
MMBtu
06 2.7491: Insulate glazing, walls, ceilings, and roofs $2,513 $2,503 - - - $2,513
-
MMBtu
07 2.7241: Install outside air damper / economizer on hvac unit $946 $2,100 $946
26,484
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,850 $255 $4,850
135,780
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,549 $4,061 $544
15,234
kWh
$1,005
-
kW-mo/yr
- -
TOTAL RECOMMENDED $169,598 $156,328 $48,656
1,362,062
kWh
$50,565
-
kW-mo/yr
$10,406 $59,971
-
MMBtu
TOTAL IMPLEMENTED $15,995 $7,123 $5,394
151,014
kWh
$1,005
-
kW-mo/yr
- $9,596
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs