ITAC Assessment: BS0029
ITAC logo
ITAC Assessment: BS0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Sewage Treatment Plant
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 48,000
ft2
Annual Production 16,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,804 15,693,503
kWh
Electricity Demand $140,537 27,391
kW-mo/yr
Electricity Fees $160,598 -
Natural Gas $37,676 5,581
MMBtu
Fuel Oil #2 $35,902 1,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Gas Savings
01 2.8226: Increase efficiency of trucks $19,366 $24,000 - - - $35,902
-
MMBtu
$(-16,536.0)
-
MMBtu
02 2.1336: Install equipment to utilize waste fuel $57,736 $307,920 $36,346
938,700
kWh
$4,767
-
kW-mo/yr
$16,623
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,130 $3,375 $10,583
273,312
kWh
$2,547
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $275 $29 $275
7,092
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,677 $726 - - $1,677
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $9,602 $33,371 - - $9,602
-
MMBtu
- -
TOTAL RECOMMENDED $101,786 $369,421 $47,204
1,219,104
kWh
$7,314
-
kW-mo/yr
$27,902
-
MMBtu
$35,902
-
MMBtu
$(-16,536.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs