ITAC Assessment: BS0026
ITAC logo
ITAC Assessment: BS0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Cast and Ductile Iron
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $500
k
to 1
M
# of Employees 10
Plant Area 25,300
ft2
Annual Production 972
ton
Production Hrs. Annual 3,060
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,549 337,040
kWh
Electricity Demand $23,390 4,640
kW-mo/yr
Other Gas $12,000 357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $339 $120 $90
1,497
kWh
$249
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $478 $15 $363
5,957
kWh
$115
-
kW-mo/yr
- -
03 3.1114: Reuse high ferrous metal dust as raw material $1,699 $1,382 $(-2.2)
(-36)
kWh
- $1,883
-
lb
$(-182.3)
04 2.6212: Turn off equipment during breaks, reduce operating time $1,850 $752 $1,850
30,322
kWh
- - -
TOTAL RECOMMENDED $4,366 $2,269 $2,301
37,740
kWh
$365
-
kW-mo/yr
$1,883
-
lb
$(-182.3)
TOTAL IMPLEMENTED $2,668 $887 $2,303
37,776
kWh
$365
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs