Assessment Year | 2013 |
---|---|
Principal Product | Commercial Printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 77 |
Plant Area |
60,000
ft2
|
Annual Production | 28,000,000
pieces
|
Production Hrs. Annual | 4,410
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,066 | 712,800 |
kWh
|
$0.044 |
Electricity Demand | $15,592 | 2,696 |
kW-mo/yr
|
$5.78 |
Electricity Fees | $202 | - |
|
- |
Natural Gas | $8,791 | 1,293 |
MMBtu
|
$6.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $3,265 | $5,608 |
$3,265
74,913
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $108 | $30 |
$19
443
kWh
|
$89
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $323 | $363 |
$58
1,325
kWh
|
$265
-
kW-mo/yr
|
- | |
04 | 2.6218: Turn off equipment when not in use | $118 | $66 |
$118
2,708
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $553 | $30 |
$553
12,689
kWh
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $3,029 | $210 |
$2,243
51,470
kWh
|
$786
-
kW-mo/yr
|
- | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $74 | $264 |
$74
1,690
kWh
|
- | - | |
08 | 3.6192: Use a less expensive method of waste removal | $187 | $120 | - | - |
$187
-
lb
|
|
TOTAL RECOMMENDED | $7,657 | $6,691 |
$6,330
145,238
kWh
|
$1,140
-
kW-mo/yr
|
$187
-
lb
|
||
TOTAL IMPLEMENTED | $1,289 | $609 |
$748
17,165
kWh
|
$354
-
kW-mo/yr
|
$187
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs