| Assessment Year | 2012 |
|---|---|
| Principal Product | Carbonated Soft Drinks |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $50 M to 100M |
| # of Employees | 140 |
| Plant Area |
250,000
ft2
|
| Annual Production | 10,350
Tgal
|
| Production Hrs. Annual | 2,480
hrs
|
| Location (State) | Idaho |
| View Case Study | |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,942 | 2,870,555 |
kWh
|
$0.030 |
| Electricity Demand | $51,928 | 12,446 |
kW-mo/yr
|
$4.17 |
| Electricity Fees | $41,829 | - |
|
- |
| Natural Gas | $105,383 | 13,161 |
MMBtu
|
$8.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,229 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $6,068 | $12,300 | - |
$6,068
-
MMBtu
|
|
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $19,506 | $35,200 |
$(-555.8)
(-17,884)
kWh
|
$20,062
-
MMBtu
|
|
| 03 | 2.7224: Reduce space conditioning during non-working hours | $1,703 | - | - |
$1,703
-
MMBtu
|
|
| 04 | 2.4226: Use / purchase optimum sized compressor | $2,535 | $1,894 |
$2,535
81,586
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,664 | $1,616 |
$1,664
53,539
kWh
|
- | |
| 06 | 2.7124: Make a practice of turning off lights when not needed | $1,034 | $200 |
$1,034
33,271
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $96 | $160 |
$96
3,092
kWh
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,474 | $5,640 |
$3,474
111,790
kWh
|
- | |
| 09 | 2.4235: Remove or close off unneeded compressed air lines | $1,158 | $2,282 |
$1,158
37,248
kWh
|
- | |
| TOTAL RECOMMENDED | $37,238 | $59,292 |
$9,405
302,642
kWh
|
$27,833
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,229 | $51,758 |
$3,396
109,266
kWh
|
$27,833
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs