| Assessment Year | 2014 |
|---|---|
| Principal Product | Ready-mixed concrete |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $50 M to 100M |
| # of Employees | 15 |
| Plant Area |
23,650
ft2
|
| Annual Production | 150,000
units
|
| Production Hrs. Annual | 2,392
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,661 | 1,394,955 |
kWh
|
$0.069 |
| Electricity Demand | $21,772 | 3,353 |
kW-mo/yr
|
$6.49 |
| Electricity Fees | $1,055 | - |
|
- |
| Natural Gas | $73,858 | 10,150 |
MMBtu
|
$7.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $3,951 | $20,000 | - | - |
$3,951
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,465 | $7,100 |
$2,481
35,807
kWh
|
$1,162
-
kW-mo/yr
|
- | $(-99.0) | $(-79.0) | |
| 03 | 2.1213: Direct warmest air to combustion intake | $2,852 | $5,000 |
$(-41.0)
(-587)
kWh
|
$(-39.0)
-
kW-mo/yr
|
$2,932
-
MMBtu
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,048 | $2,790 |
$541
7,810
kWh
|
$507
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $811 | $200 |
$242
3,497
kWh
|
$569
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $608 | $1,500 |
$436
6,293
kWh
|
$172
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $478 | $350 |
$277
3,395
kWh
|
$36
-
kW-mo/yr
|
- | $69 | $96 | |
| 08 | 2.7134: Use photocell controls | $444 | $435 |
$231
3,338
kWh
|
$163
-
kW-mo/yr
|
- | $29 | $21 | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,206 | $3,300 |
$722
10,418
kWh
|
$339
-
kW-mo/yr
|
- | $112 | $33 | |
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $197 | $20 |
$134
1,927
kWh
|
$63
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $15,060 | $40,695 |
$5,023
71,898
kWh
|
$2,972
-
kW-mo/yr
|
$6,883
-
MMBtu
|
$111 | $71 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs