ITAC Assessment: BD0447
ITAC logo
ITAC Assessment: BD0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Ready-mixed concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 15
Plant Area 23,650
ft2
Annual Production 150,000
units
Production Hrs. Annual 2,392
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,661 1,394,955
kWh
Electricity Demand $21,772 3,353
kW-mo/yr
Electricity Fees $1,055 -
Natural Gas $73,858 10,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1221: Replace obsolete burners with more efficient ones $3,951 $20,000 - - $3,951
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,465 $7,100 $2,481
35,807
kWh
$1,162
-
kW-mo/yr
- $(-99.0) $(-79.0)
03 2.1213: Direct warmest air to combustion intake $2,852 $5,000 $(-41.0)
(-587)
kWh
$(-39.0)
-
kW-mo/yr
$2,932
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $1,048 $2,790 $541
7,810
kWh
$507
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $811 $200 $242
3,497
kWh
$569
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $608 $1,500 $436
6,293
kWh
$172
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $478 $350 $277
3,395
kWh
$36
-
kW-mo/yr
- $69 $96
08 2.7134: Use photocell controls $444 $435 $231
3,338
kWh
$163
-
kW-mo/yr
- $29 $21
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,206 $3,300 $722
10,418
kWh
$339
-
kW-mo/yr
- $112 $33
10 2.4231: Reduce the pressure of compressed air to the minimum required $197 $20 $134
1,927
kWh
$63
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $15,060 $40,695 $5,023
71,898
kWh
$2,972
-
kW-mo/yr
$6,883
-
MMBtu
$111 $71
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs