Assessment Year | 2014 |
---|---|
Principal Product | Custom engineered product movers |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
50,444
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,383 | 442,763 |
kWh
|
$0.064 |
Electricity Demand | $12,160 | 2,132 |
kW-mo/yr
|
$5.70 |
Electricity Fees | $2,439 | - |
|
- |
Natural Gas | $15,255 | 2,499 |
MMBtu
|
$6.10 |
LPG | $2,075 | 54 |
MMBtu
|
$38.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,925 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $3,813 | $2,600 |
$2,619
40,846
kWh
|
$1,194
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $273 | $450 |
$237
3,691
kWh
|
$36
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $505 | $20 |
$347
5,426
kWh
|
$158
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $300 | $280 |
$171
2,663
kWh
|
$21
-
kW-mo/yr
|
- | $46 | $62 | - | |
05 | 2.2437: Recover waste heat from equipment | $1,765 | $3,000 | - | - |
$1,765
-
MMBtu
|
- | - | - | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $4,867 | $83 | - | - | - | - | $4,867 | - | |
07 | 4.322: Eliminate old stock and modify inventory control | $4,000 | $900 | - | - | - | - | - | $4,000 | |
08 | 4.632: Change operating conditions | $1,402 | $30 | - | - | - | - | $1,402 | - | |
TOTAL RECOMMENDED | $16,925 | $7,363 |
$3,374
52,626
kWh
|
$1,409
-
kW-mo/yr
|
$1,765
-
MMBtu
|
$46 | $6,331 | $4,000 | ||
TOTAL IMPLEMENTED | $11,280 | $6,810 |
$2,790
43,509
kWh
|
$1,215
-
kW-mo/yr
|
$1,765
-
MMBtu
|
$46 | $1,464 | $4,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs