ITAC Assessment: BD0441
ITAC logo
ITAC Assessment: BD0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Custom engineered product movers
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 50,444
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,383 442,763
kWh
Electricity Demand $12,160 2,132
kW-mo/yr
Electricity Fees $2,439 -
Natural Gas $15,255 2,499
MMBtu
LPG $2,075 54
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2135: Repair and eliminate steam leaks $3,813 $2,600 $2,619
40,846
kWh
$1,194
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $273 $450 $237
3,691
kWh
$36
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $505 $20 $347
5,426
kWh
$158
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $300 $280 $171
2,663
kWh
$21
-
kW-mo/yr
- $46 $62 -
05 2.2437: Recover waste heat from equipment $1,765 $3,000 - - $1,765
-
MMBtu
- - -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $4,867 $83 - - - - $4,867 -
07 4.322: Eliminate old stock and modify inventory control $4,000 $900 - - - - - $4,000
08 4.632: Change operating conditions $1,402 $30 - - - - $1,402 -
TOTAL RECOMMENDED $16,925 $7,363 $3,374
52,626
kWh
$1,409
-
kW-mo/yr
$1,765
-
MMBtu
$46 $6,331 $4,000
TOTAL IMPLEMENTED $11,280 $6,810 $2,790
43,509
kWh
$1,215
-
kW-mo/yr
$1,765
-
MMBtu
$46 $1,464 $4,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs