ITAC Assessment: BD0435
ITAC logo
ITAC Assessment: BD0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel and iron work for repair and construction of locks and dams
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,930 1,288,864
kWh
Electricity Demand $29,986 3,725
kW-mo/yr
Electricity Fees $240 -
Natural Gas $8,694 1,210
MMBtu
LPG $1,062 52
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,612 $12,980 $1,912
45,752
kWh
$1,700
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $1,708 $500 $533
12,754
kWh
$790
-
kW-mo/yr
- $96 $289
03 2.7142: Utilize higher efficiency lamps and/or ballasts $654 $730 $292
6,990
kWh
$77
-
kW-mo/yr
- $121 $164
04 2.7231: Use radiant heater for spot heating $618 $2,100 - - $618
-
MMBtu
- -
05 2.7135: Install occupancy sensors $287 $250 $152
3,636
kWh
$135
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $6,879 $16,560 $2,889
69,132
kWh
$2,702
-
kW-mo/yr
$618
-
MMBtu
$217 $453
TOTAL IMPLEMENTED $4,266 $13,710 $2,204
52,742
kWh
$1,777
-
kW-mo/yr
- $121 $164
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs