ITAC Assessment: UF0585
ITAC logo
ITAC Assessment: UF0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Spice Blends and Salad Dressings
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 300,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,666 8,353,090
kWh
Electricity Demand $120,136 17,212
kW-mo/yr
Electricity Fees $483,744 -
Natural Gas $229,887 49,173
MMBtu
Waste Disposal Costs
Water Usage $69,643 31,015
Tgal
Water Disposal $362,567 24,068
Tgal
TOTAL YEARLY COSTS $1,460,643
RECOMMENDED SAVINGS* $116,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $21,858 $44,939 $13,448
584,716
kWh
$8,410
-
kW-mo/yr
- - -
02 2.2121: Increase amount of condensate returned $11,758 $1,342 - - $11,758
-
MMBtu
- -
03 2.1222: Install turbulators $6,811 $7,500 - - $6,811
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,918 $756 $4,918
213,841
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $1,345 - $1,345
58,486
kWh
- - - -
06 4.662: Level one – add communication using iiot devices to existing control system to modify operations $45,977 - - - - - $45,977
07 4.661: Level zero – install control systems for existing equipment $19,210 $10,000 $19,210
835,209
kWh
- - - -
08 4.611: Begin a practice of predictive / preventative maintenance $4,436 $448 $2,255
98,024
kWh
- - $2,181
-
Tgal
-
TOTAL RECOMMENDED $116,313 $64,985 $41,176
1,790,276
kWh
$8,410
-
kW-mo/yr
$18,569
-
MMBtu
$2,181
-
Tgal
$45,977
TOTAL IMPLEMENTED $111,877 $64,537 $38,921
1,692,252
kWh
$8,410
-
kW-mo/yr
$18,569
-
MMBtu
- $45,977
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs