Assessment Year | 2011 |
---|---|
Principal Product | Heat-treated parts |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
21,760
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,754 | 3,352,454 |
kWh
|
$0.072 |
Electricity Demand | $52,981 | 8,957 |
kW-mo/yr
|
$5.92 |
Electricity Fees | $9,605 | - |
|
- |
Natural Gas | $153,186 | 29,450 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,372 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $58,796 | $139,000 | - | - |
$58,796
-
MMBtu
|
|
02 | 2.1116: Improve combustion control capability | $35,291 | $9,000 | - | - |
$35,291
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,544 | $2,400 |
$5,878
82,210
kWh
|
$666
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,571 | $2,360 |
$3,208
44,863
kWh
|
$363
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,201 | $1,652 |
$1,978
27,666
kWh
|
$223
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,201 | $400 |
$1,079
15,096
kWh
|
$122
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $855 | $225 |
$697
9,755
kWh
|
$158
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $108,459 | $155,037 |
$12,840
179,590
kWh
|
$1,532
-
kW-mo/yr
|
$94,087
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,372 | $7,037 |
$12,840
179,590
kWh
|
$1,532
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs