ITAC Assessment: BD0379
ITAC logo
ITAC Assessment: BD0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Turbine engine components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area 89,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,078 7,800,622
kWh
Electricity Demand $84,386 15,780
kW-mo/yr
Electricity Fees $41,695 -
Natural Gas $37,232 2,661
MMBtu
LPG $60,000 2,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8227: Adjust / maintain fork lift trucks for most efficient operation $43,359 $156,000 $(-8,545.0)
(-270,400)
kWh
$(-8,096.0)
-
kW-mo/yr
$60,000
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $12,675 $5,775 $9,193
290,906
kWh
$3,482
-
kW-mo/yr
- - - -
03 2.2625: Chill water to the highest temperature possible $10,691 $14,000 $10,691
222,700
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $8,550 $8,550 $6,498
205,629
kWh
$2,052
-
kW-mo/yr
- - - -
05 2.4314: Use synthetic lubricant $1,393 $300 $1,059
33,516
kWh
$334
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $198 $350 $105
3,328
kWh
$24
-
kW-mo/yr
- - $29 $40
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,893 $300 - $6,893
-
kW-mo/yr
- - - -
08 3.3125: Use distillation, evaporation to remove contaminants $2,879 $1,680 $(-20.6)
(-3,633)
kWh
- - $4,200
-
gal
$(-1,300.0) -
TOTAL RECOMMENDED $86,638 $186,955 $18,980
482,046
kWh
$4,689
-
kW-mo/yr
$60,000
-
MMBtu
$4,200
-
gal
$(-1,271.0) $40
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs