Assessment Year | 2010 |
---|---|
Principal Product | Turbine engine components |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 380 |
Plant Area |
89,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $250,078 | 7,800,622 |
kWh
|
$0.032 |
Electricity Demand | $84,386 | 15,780 |
kW-mo/yr
|
$5.35 |
Electricity Fees | $41,695 | - |
|
- |
Natural Gas | $37,232 | 2,661 |
MMBtu
|
$13.99 |
LPG | $60,000 | 2,748 |
MMBtu
|
$21.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $43,359 | $156,000 |
$(-8,545.0)
(-270,400)
kWh
|
$(-8,096.0)
-
kW-mo/yr
|
$60,000
-
MMBtu
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $12,675 | $5,775 |
$9,193
290,906
kWh
|
$3,482
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2625: Chill water to the highest temperature possible | $10,691 | $14,000 |
$10,691
222,700
kWh
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $8,550 | $8,550 |
$6,498
205,629
kWh
|
$2,052
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4314: Use synthetic lubricant | $1,393 | $300 |
$1,059
33,516
kWh
|
$334
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $198 | $350 |
$105
3,328
kWh
|
$24
-
kW-mo/yr
|
- | - | $29 | $40 | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,893 | $300 | - |
$6,893
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.3125: Use distillation, evaporation to remove contaminants | $2,879 | $1,680 |
$(-20.6)
(-3,633)
kWh
|
- | - |
$4,200
-
gal
|
$(-1,300.0) | - | |
TOTAL RECOMMENDED | $86,638 | $186,955 |
$18,980
482,046
kWh
|
$4,689
-
kW-mo/yr
|
$60,000
-
MMBtu
|
$4,200
-
gal
|
$(-1,271.0) | $40 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs