Assessment Year | 2008 |
---|---|
Principal Product | Wire Forms, Tube Fabrications, Rod Ends |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
90,000
ft2
|
Annual Production | 2,880,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,875 | 1,129,560 |
kWh
|
$0.070 |
Natural Gas | $79,194 | 8,706 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $10,631 | $12,501 |
$10,631
1,148
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,924 | $6,730 |
$1,924
95
kWh
|
|
03 | 2.7145: Install skylights | $693 | $5,713 |
$693
34
kWh
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $188 | $405 |
$188
11
kWh
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $788 | $788 |
$788
40
kWh
|
|
06 | 2.7243: Improve air circulation with destratification fans / other methods | $3,874 | $9,167 |
$3,874
48
kWh
|
|
TOTAL RECOMMENDED | $18,098 | $35,304 |
$18,098
1,376
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |