Assessment Year | 2008 |
---|---|
Principal Product | Animal feeds |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
35,000
ft2
|
Annual Production | 17,000
ton
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,052 | 616,483 |
kWh
|
$0.097 |
Natural Gas | $30,292 | 5,500 |
MMBtu
|
$5.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83 | $35 |
$66
916
kWh
|
- | - | $8 | $9 | |
02 | 2.7135: Install occupancy sensors | $221 | $75 |
$220
3,120
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $55 | $2 |
$54
774
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
04 | 2.4314: Use synthetic lubricant | $116 | $76 |
$115
1,635
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $10,344 | $2,501 | - | - |
$10,344
-
MMBtu
|
- | - | |
06 | 2.1222: Install turbulators | $755 | $781 | - | - |
$755
-
MMBtu
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,766 | $9,021 |
$7,765
110,300
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $19,340 | $12,491 |
$8,220
116,745
kWh
|
$4
-
kW-mo/yr
|
$11,099
-
MMBtu
|
$8 | $9 | ||
TOTAL IMPLEMENTED | $7,965 | $9,132 |
$7,946
112,851
kWh
|
$2
-
kW-mo/yr
|
- | $8 | $9 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs