| Assessment Year | 2007 |
|---|---|
| Principal Product | magnet wire |
| NAICS | 335929: Other Communication and Energy Wire Manufacturing |
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | less than $500 k |
| # of Employees | 250 |
| Plant Area |
275,000
ft2
|
| Annual Production | 93,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,449,150 | 34,315,847 |
kWh
|
$0.042 |
| Natural Gas | $1,846,987 | 235,039 |
MMBtu
|
$7.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $535,284 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $268,435 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7231: Use radiant heater for spot heating | $242,313 | $111,001 | - | - |
$242,313
-
MMBtu
|
|
| 02 | 2.1221: Replace obsolete burners with more efficient ones | $210,390 | $615,001 | - | - |
$210,390
-
MMBtu
|
|
| 03 | 2.2191: Substitute hot process fluids for steam | $55,549 | $2,097 | - | - |
$55,549
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,532 | $3,690 |
$5,485
242,718
kWh
|
$2,047
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $3,999 | $1,576 |
$2,325
102,871
kWh
|
$1,674
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $910 | $2 |
$559
24,756
kWh
|
$351
-
kW-mo/yr
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $3,966 | $301 |
$2,437
107,827
kWh
|
$1,529
-
kW-mo/yr
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $10,625 | $24,551 |
$5,378
237,934
kWh
|
$5,247
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $535,284 | $758,219 |
$16,184
716,106
kWh
|
$10,848
-
kW-mo/yr
|
$508,252
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $268,435 | $141,119 |
$15,625
691,350
kWh
|
$10,497
-
kW-mo/yr
|
$242,313
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs