ITAC Assessment: BD0307
ITAC logo
ITAC Assessment: BD0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Injection molded plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 39
Plant Area 20,000
ft2
Annual Production 15,900,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,736 1,268,698
kWh
Electricity Demand $7,925 3,538
kW-mo/yr
Electricity Fees $15,080 -
Natural Gas $5,385 479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $5,936 $9,020 $5,446
111,825
kWh
$490
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,061 $723 $1,894
38,878
kWh
$167
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,899 $400 $1,787
36,694
kWh
$112
-
kW-mo/yr
04 2.7135: Install occupancy sensors $961 $600 $881
18,086
kWh
$80
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $369 $300 $340
6,982
kWh
$29
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $144 - $132
2,806
kWh
$12
-
kW-mo/yr
TOTAL RECOMMENDED $11,370 $11,043 $10,480
215,271
kWh
$890
-
kW-mo/yr
TOTAL IMPLEMENTED $4,104 $1,123 $3,813
78,378
kWh
$291
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs