ITAC Assessment: BD0293
ITAC logo
ITAC Assessment: BD0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Advanced film and fabric sheets and belts
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 64,000
ft2
Annual Production 650
ton
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,613 984,293
kWh
Electricity Demand $13,354 3,120
kW-mo/yr
Electricity Fees $3,786 -
Natural Gas $24,359 30,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $14,847 $2,400 $14,847
226,319
kWh
- - - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,468 $5,250 $3,221
57,005
kWh
$699
-
kW-mo/yr
- - - $150 $398
03 2.2437: Recover waste heat from equipment $824 $2,100 - - $824
-
MMBtu
- - - -
04 2.7135: Install occupancy sensors $1,306 $1,125 $1,026
18,160
kWh
$280
-
kW-mo/yr
- - - - -
05 2.3137: Use power during off-peak periods $950 $1,700 - $950
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $700 $301
5,326
kWh
$31
-
kW-mo/yr
- - - $194 $214
07 3.4111: Use closed cycle process to minimize waste water production $4,251 $1,250 - - - $4,251
-
Tgal
- - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $1,306 $3,500 - - - - $1,306
-
lb
- -
TOTAL RECOMMENDED $28,692 $18,025 $19,395
306,810
kWh
$1,960
-
kW-mo/yr
$824
-
MMBtu
$4,251
-
Tgal
$1,306
-
lb
$344 $612
TOTAL IMPLEMENTED $22,918 $9,275 $16,174
249,805
kWh
$1,261
-
kW-mo/yr
$824
-
MMBtu
$4,251
-
Tgal
- $194 $214
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs