ITAC Assessment: BD0279
ITAC logo
ITAC Assessment: BD0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ferrous and non-ferrous metal parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 63
Plant Area 83,900
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,524 1,658,171
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $25,688 $8,400 $43,519
795,592
kWh
$(-17,831.0)
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $2,079 $3,170 $2,079
36,665
kWh
- - -
03 2.7135: Install occupancy sensors $846 $150 $772
13,607
kWh
- $13 $61
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $678 $480 $678
11,954
kWh
- - -
TOTAL RECOMMENDED $29,291 $12,200 $47,048
857,818
kWh
$(-17,831.0)
-
MMBtu
$13 $61
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs