ITAC Assessment: BD0268
ITAC logo
ITAC Assessment: BD0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Rubber stock used for hudraulic, industrial, and automotive hoses
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 470,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $892,942 25,156,943
kWh
Electricity Demand $435,649 48,401
kW-mo/yr
Natural Gas $464,987 81,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $548,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $532,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7229: Air condition only space necessary $352,557 $1,500,000 $9,638
271,515
kWh
$6,713
-
kW-mo/yr
$16,766
-
MMBtu
- - $319,440 -
02 2.2191: Substitute hot process fluids for steam $81,415 $130,000 - - $81,415
-
MMBtu
- - - -
03 2.1133: Adjust burners for efficient operation $40,434 $49,000 - - $40,434
-
MMBtu
- - - -
04 2.2447: Heat water with exhaust heat $31,790 $35,000 - - $31,790
-
MMBtu
- - - -
05 2.7131: Add area lighting switches $14,266 $9,000 - - $14,266
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,170 $200 $3,837
108,088
kWh
$1,333
-
kW-mo/yr
- - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $2,701 $1,500 - - $2,701
-
MMBtu
- - - -
08 2.7135: Install occupancy sensors $784 $1,320 $199
7,170
kWh
$585
-
kW-mo/yr
- - - - -
09 2.7134: Use photocell controls $605 $240 $276
7,779
kWh
$288
-
kW-mo/yr
- - $15 - $26
10 2.7111: Reduce illumination to minimum necessary levels $461 $20 $342
9,636
kWh
$119
-
kW-mo/yr
- - - - -
11 3.1191: Change procedures / equipment / operating conditions $15,653 $6,914 - - - $15,653
-
lb
- - -
12 3.1162: Use less wasteful packaging $1,586 $3,600 - - - $360
-
lb
$1,226 - -
13 4.431: Train operators for maximum operating efficiency $861 $173 - - - - $861 - -
TOTAL RECOMMENDED $548,283 $1,736,967 $14,292
404,188
kWh
$9,038
-
kW-mo/yr
$187,372
-
MMBtu
$16,013
-
lb
$2,102 $319,440 $26
TOTAL IMPLEMENTED $532,628 $1,726,407 $13,817
389,239
kWh
$8,165
-
kW-mo/yr
$173,106
-
MMBtu
$16,013
-
lb
$2,087 $319,440 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs