ITAC Assessment: BD0235
ITAC logo
ITAC Assessment: BD0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 60,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,500 1,884,096
kWh
Electricity Demand $13,834 5,910
kW-mo/yr
Electricity Fees $156 -
Natural Gas $6,643 1,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,609 $7,200 $10,685
259,983
kWh
$975
-
kW-mo/yr
$(-7,051.0)
-
MMBtu
- - - -
02 2.7135: Install occupancy sensors $3,778 $5,025 $3,324
80,862
kWh
$454
-
kW-mo/yr
- - - - -
03 2.2437: Recover waste heat from equipment $2,478 $3,000 - - $2,478
-
MMBtu
- - - -
04 2.7135: Install occupancy sensors $2,330 $5,700 $2,314
56,291
kWh
$100
-
kW-mo/yr
- - - $(-84.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $814 $370 $470
11,405
kWh
$86
-
kW-mo/yr
- - - $173 $85
06 2.7231: Use radiant heater for spot heating $267 $600 - - $267
-
MMBtu
- - - -
07 2.4221: Install compressor air intakes in coolest locations $236 $500 $219
5,328
kWh
$17
-
kW-mo/yr
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $214 $300 $198
4,823
kWh
$16
-
kW-mo/yr
- - - - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,665 $5,500 - - - - $2,665
-
lb
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $317 $1,200 - - - $317
-
gal
- - -
11 4.441: Install automatic packing equipment $73,846 $7,500 - - - - - $73,846 -
12 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,577 $2,000 - $1,577
-
kW-mo/yr
- - - - -
13 4.213: Purchase material from supplier in customized packaging $350 $80 - - - - - - $350
TOTAL RECOMMENDED $93,481 $38,975 $17,210
418,692
kWh
$3,225
-
kW-mo/yr
$(-4,306.0)
-
MMBtu
$317
-
gal
$2,665
-
lb
$73,935 $435
TOTAL IMPLEMENTED $77,659 $15,180 $198
4,823
kWh
$16
-
kW-mo/yr
$267
-
MMBtu
$317
-
gal
$2,665
-
lb
$73,846 $350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs