ITAC Assessment: BD0230
ITAC logo
ITAC Assessment: BD0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Dessert products (no sugar added)
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,041 1,038,560
kWh
Electricity Demand $19,580 2,720
kW-mo/yr
Electricity Fees $156 -
Natural Gas $35,223 7,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2442: Preheat combustion air with waste heat $8,785 $26,000 - - $8,785
-
MMBtu
- -
02 2.7135: Install occupancy sensors $1,153 $2,100 $733
18,054
kWh
$420
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $769 $2,115 $542
13,356
kWh
$129
-
kW-mo/yr
- $98 -
04 2.7111: Reduce illumination to minimum necessary levels $605 $75 $388
9,568
kWh
$199
-
kW-mo/yr
- $18 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $317 $975 $249
6,136
kWh
$56
-
kW-mo/yr
- $12 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $182 $68 $82
2,031
kWh
$41
-
kW-mo/yr
- $59 -
07 2.2123: Insulate feedwater tank $101 $125 - - $101
-
MMBtu
- -
08 3.5317: Sell / offer by-product as animal feed $1,440 $1,000 - - - - $1,440
09 3.5316: Contract a wood pallet recycling company $24,000 $1,000 - - - - $24,000
10 3.5217: Reuse / recycle/ sell paper products $15,600 $300 - - - - $15,600
TOTAL RECOMMENDED $52,952 $33,758 $1,994
49,145
kWh
$845
-
kW-mo/yr
$8,886
-
MMBtu
$187 $41,040
TOTAL IMPLEMENTED $41,641 $3,668 $1,203
29,653
kWh
$660
-
kW-mo/yr
$101
-
MMBtu
$77 $39,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs