ITAC Assessment: BD0219
ITAC logo
ITAC Assessment: BD0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Steel Castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 100,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,221 9,232,154
kWh
Electricity Demand $216,992 86,702
kW-mo/yr
Natural Gas $127,850 30,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7231: Use radiant heater for spot heating $12,344 $22,000 - - $12,344
-
MMBtu
- - -
02 2.4133: Use most efficient type of electric motors $3,195 $17,710 $2,546
88,873
kWh
$649
-
kW-mo/yr
- - - -
03 2.4314: Use synthetic lubricant $2,594 $800 $1,938
67,696
kWh
$656
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,360 $1,600 $1,042
36,416
kWh
$318
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $1,308 $1,650 $886
31,067
kWh
$422
-
kW-mo/yr
- - - -
06 2.7134: Use photocell controls $604 $1,000 $159
5,569
kWh
$213
-
kW-mo/yr
- - $190 $42
07 2.7142: Utilize higher efficiency lamps and/or ballasts $458 $557 $181
6,448
kWh
$16
-
kW-mo/yr
- - $109 $152
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $254 $480 $195
6,741
kWh
$59
-
kW-mo/yr
- - - -
09 3.4114: Replace city water with recycled water via cooling tower $1,725 $5,000 - - - $1,725
-
Tgal
- -
10 2.2622: Replace existing chiller with high efficiency model $23,058 $10,000 - - - $23,058
-
Tgal
- -
11 3.4151: Minimize water usage $753 $690 - - - $753
-
Tgal
- -
TOTAL RECOMMENDED $47,653 $61,487 $6,947
242,810
kWh
$2,333
-
kW-mo/yr
$12,344
-
MMBtu
$25,536
-
Tgal
$299 $194
TOTAL IMPLEMENTED $20,097 $43,110 $5,685
198,554
kWh
$1,836
-
kW-mo/yr
$12,344
-
MMBtu
- $190 $42
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs