ITAC Assessment: BD0213
ITAC logo
ITAC Assessment: BD0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Automative Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 411
Plant Area 186,000
ft2
Annual Production 3,520,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,789 17,953,434
kWh
Electricity Demand $448,769 39,290
kW-mo/yr
Electricity Fees $4,560 -
Natural Gas $345,654 52,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2311: Heat treat parts only to required specifications or standards $40,151 $138,000 - - $40,151
-
MMBtu
- - - -
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $29,490 $10,000 $11,373
376,588
kWh
$6,892
-
kW-mo/yr
$8,685
-
MMBtu
$2,540
-
Tgal
- - -
03 2.1123: Install automatic stack damper $12,416 $15,000 - - $12,416
-
MMBtu
- - - -
04 2.1222: Install turbulators $3,780 $2,194 - - $3,780
-
MMBtu
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,926 - $1,822
60,317
kWh
$1,104
-
kW-mo/yr
- - - - -
06 2.7145: Install skylights $2,793 $11,150 $1,092
36,166
kWh
$1,701
-
kW-mo/yr
- - - - -
07 2.7135: Install occupancy sensors $1,056 $600 $604
29,894
kWh
$452
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $349 $352 $121
4,103
kWh
$63
-
kW-mo/yr
- - - - $165
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $170 $400 $106
3,517
kWh
$64
-
kW-mo/yr
- - - - -
10 3.4151: Minimize water usage $2,041 $1,840 - - - $2,041
-
Tgal
- - -
11 4.441: Install automatic packing equipment $15,100 $18,000 - - - - $15,100 - -
12 3.5316: Contract a wood pallet recycling company $2,600 $155 - - - - - $2,600 -
TOTAL RECOMMENDED $112,872 $197,691 $15,118
510,585
kWh
$10,276
-
kW-mo/yr
$65,032
-
MMBtu
$4,581
-
Tgal
$15,100 $2,600 $165
TOTAL IMPLEMENTED $36,435 $22,150 $14,997
506,482
kWh
$10,213
-
kW-mo/yr
$8,685
-
MMBtu
$2,540
-
Tgal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs