ITAC Assessment: BD0200
ITAC logo
ITAC Assessment: BD0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Asphalt Paving Compound
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 75,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 2,532
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,832 482,448
kWh
Electricity Demand $54,782 3,899
kW-mo/yr
Electricity Fees $1,608 -
Natural Gas $28,650 3,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,728 $1,100 $1,860
37,682
kWh
$2,868
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,134 $1,120 $410
8,303
kWh
$724
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,124 $2,000 $440
8,917
kWh
$684
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $657 - $257
5,211
kWh
$400
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $460 $1,200 $181
3,656
kWh
$279
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $440 $1,720 $202
4,086
kWh
$238
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $342 $600 $108
2,171
kWh
$234
-
kW-mo/yr
-
08 4.447: Automate payroll system $19,760 $17,300 - - $19,760
TOTAL RECOMMENDED $28,645 $25,040 $3,458
70,026
kWh
$5,427
-
kW-mo/yr
$19,760
TOTAL IMPLEMENTED $7,985 $4,820 $3,075
62,284
kWh
$4,910
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs