ITAC Assessment: BD0197
ITAC logo
ITAC Assessment: BD0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electro-Mechanical Devices
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,828 370,394
kWh
Electricity Demand $13,389 1,132
kW-mo/yr
Electricity Fees $4,785 -
Natural Gas $19,145 2,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.7231: Use radiant heater for spot heating $3,885 $3,000 - - $3,885
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,659 $5,000 $655
14,724
kWh
$1,004
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,104 $600 $434
9,802
kWh
$670
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $229 $157 $124
2,785
kWh
$105
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $144 $450 $44
978
kWh
$100
-
kW-mo/yr
- -
06 4.821: Pay bills on time to avoid late fees $418 - - - - $418
TOTAL RECOMMENDED $7,439 $9,207 $1,257
28,289
kWh
$1,879
-
kW-mo/yr
$3,885
-
MMBtu
$418
TOTAL IMPLEMENTED $3,554 $6,207 $1,257
28,289
kWh
$1,879
-
kW-mo/yr
- $418
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs