ITAC Assessment: BD0167
ITAC logo
ITAC Assessment: BD0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Specialty Cutting Tools
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 25,000
ft2
Annual Production 16,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,763 483,880
kWh
Electricity Demand $26,293 2,116
kW-mo/yr
Electricity Fees $292 -
Natural Gas $3,223 552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,161 $500 n/a $636
12,896
kWh
$525
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $776 $1,750 n/a $317
6,448
kWh
$459
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $529 $600 n/a $259
5,275
kWh
$270
-
kW-mo/yr
- -
04 3.3131: Use evaporation to concentrate material $924 $3,400 n/a - - $924
-
Tgal
-
05 3.4151: Minimize water usage $328 $1,080 n/a - - $328
-
Tgal
-
06 4.515: Install shelves / racks to utilize unused space $273,586 $375,000 n/a - - - $273,586
TOTAL RECOMMENDED $277,304 $382,330 $1,212
24,619
kWh
$1,254
-
kW-mo/yr
$1,252
-
Tgal
$273,586
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs