ITAC Assessment: BD0166
ITAC logo
ITAC Assessment: BD0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Specialty Chemicals
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 135,000
ft2
Annual Production 210,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,854 10,930,539
kWh
Electricity Demand $163,076 17,471
kW-mo/yr
Electricity Fees $(-3,678.0) -
Natural Gas $40,337 8,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $430,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
01 2.2437: Recover waste heat from equipment $2,357 $2,000 $1,695
63,013
kWh
$662
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $2,182 $2,700 $1,192
41,325
kWh
$990
-
kW-mo/yr
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,263 - $875
30,481
kWh
$388
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $823 $500 $569
19,637
kWh
$254
-
kW-mo/yr
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $594 $1,000 $411
14,361
kWh
$183
-
kW-mo/yr
- - - - -
06 2.1223: Install smaller boiler (increase high fire duty cycle) $380,939 $600,000 - - - $380,939 - - -
07 4.112: Replace old machine with new automatic multi-station tool $33,228 $35,000 - - - - - - $33,228
08 4.441: Install automatic packing equipment $6,646 $2,000 - - - - - $6,646 -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,759 $6,500 - - $1,759
-
lb
- - - -
10 2.2135: Repair and eliminate steam leaks $997 $600 - - - - $997 - -
TOTAL RECOMMENDED $430,788 $650,300 $4,742
168,817
kWh
$2,477
-
kW-mo/yr
$1,759
-
lb
$380,939 $997 $6,646 $33,228
TOTAL IMPLEMENTED $38,989 $45,300 $1,761
60,962
kWh
$1,244
-
kW-mo/yr
$1,759
-
lb
- $997 - $33,228
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs