| Assessment Year | 2000 |
|---|---|
| Principal Product | Aluminium Castings |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
42,688
ft2
|
| Annual Production | 2,800,000
lb
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $202,504 | 3,643,611 |
kWh
|
$0.056 |
| Electricity Demand | $2,639 | 1,411 |
kW-mo/yr
|
$1.87 |
| Electricity Fees | $473 | - |
|
- |
| Natural Gas | $74,343 | 16,391 |
MMBtu
|
$4.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,331 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,584 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7231: Use radiant heater for spot heating | $3,147 | $2,325 |
$2,481
44,842
kWh
|
$666
-
MMBtu
|
- | |
| 02 | 2.1221: Replace obsolete burners with more efficient ones | $2,952 | $4,600 |
$2,952
109,613
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $1,314 | $825 |
$1,314
20,516
kWh
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $507 | $1,500 | - |
$507
-
MMBtu
|
- | |
| 05 | 2.8113: Purchase gas directly from a contract gas supplier | $19,669 | $800 | - | - | $19,669 | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $9,601 | $11,200 | - | - | $9,601 | |
| 07 | 4.111: Add equipment/ operators to reduce production bottleneck | $4,141 | $3,250 | - | - | $4,141 | |
| TOTAL RECOMMENDED | $41,331 | $24,500 |
$6,747
174,971
kWh
|
$1,173
-
MMBtu
|
$33,411 | ||
| TOTAL IMPLEMENTED | $30,584 | $12,825 |
$1,314
20,516
kWh
|
- | $29,270 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs