ITAC Assessment: BD0138
ITAC logo
ITAC Assessment: BD0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Zinc Die Castings
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 73,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,093 3,830,598
kWh
Electricity Demand $105,995 8,772
kW-mo/yr
Electricity Fees $1,177 -
Natural Gas $145,628 49,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $386,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $175,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 2.1221: Replace obsolete burners with more efficient ones $32,466 $119,000 $8,752
246,483
kWh
$5,165
-
kW-mo/yr
$18,549
-
MMBtu
- - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $31,953 $91,000 $24,686
695,487
kWh
$16,388
-
kW-mo/yr
$(-9,121.0)
-
MMBtu
- - - -
03 2.2514: Cover open tanks $2,467 $5,000 - - $2,467
-
MMBtu
- - - -
04 2.4133: Use most efficient type of electric motors $1,839 $4,270 $1,026
29,015
kWh
$813
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,227 $393 $1,176
21,102
kWh
$51
-
kW-mo/yr
- - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $918 - $636
17,878
kWh
$282
-
kW-mo/yr
- - - - -
07 2.7135: Install occupancy sensors $824 $1,425 $516
9,086
kWh
$308
-
kW-mo/yr
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $630 $800 $436
12,309
kWh
$194
-
kW-mo/yr
- - - - -
09 3.1154: Use an alternative desulfurizing agent to eliminate hazardous slag formation $173,301 $3,000 - - - - $115,534
-
lb
- $57,767
10 3.4151: Minimize water usage $766 $1,665 - - - $766
-
Tgal
- - -
11 4.445: Install equipment to move product $139,776 $246,000 - - - - - $139,776 -
TOTAL RECOMMENDED $386,167 $472,553 $37,228
1,031,360
kWh
$23,201
-
kW-mo/yr
$11,895
-
MMBtu
$766
-
Tgal
$115,534
-
lb
$139,776 $57,767
TOTAL IMPLEMENTED $175,882 $343,735 $26,784
754,689
kWh
$17,677
-
kW-mo/yr
$(-9,121.0)
-
MMBtu
$766
-
Tgal
- $139,776 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs