| Assessment Year | 1999 |
|---|---|
| Principal Product | Printed Paper |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
40,000
ft2
|
| Annual Production | 5,100,000
lb
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,273 | 1,324,150 |
kWh
|
$0.046 |
| Electricity Demand | $47,459 | 3,774 |
kW-mo/yr
|
$12.58 |
| Electricity Fees | $1,279 | - |
|
- |
| Natural Gas | $7,482 | 1,558 |
MMBtu
|
$4.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,375 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $4,723 | $500 | - | - |
$4,723
-
MMBtu
|
- | - | |
| 02 | 2.7231: Use radiant heater for spot heating | $3,506 | $2,000 |
$1,270
30,188
kWh
|
$423
-
kW-mo/yr
|
$1,813
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $807 | $646 |
$495
11,723
kWh
|
$312
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,466 | $2,040 |
$1,068
25,498
kWh
|
$398
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,416 | $1,614 |
$929
22,274
kWh
|
$487
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $867 | $450 |
$571
13,775
kWh
|
$296
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.4115: Recover and reuse cooling water | $1,453 | $2,410 | - | - | - |
$1,453
-
Tgal
|
- | |
| 08 | 4.444: Install system to collect scrap | $22,068 | $8,700 | - | - | - | - | $22,068 | |
| TOTAL RECOMMENDED | $36,306 | $18,360 |
$4,333
103,458
kWh
|
$1,916
-
kW-mo/yr
|
$6,536
-
MMBtu
|
$1,453
-
Tgal
|
$22,068 | ||
| TOTAL IMPLEMENTED | $6,375 | $6,024 |
$2,199
52,462
kWh
|
$910
-
kW-mo/yr
|
$1,813
-
MMBtu
|
$1,453
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs