ITAC Assessment: BD0130
ITAC logo
ITAC Assessment: BD0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed Paper
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 40,000
ft2
Annual Production 5,100,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,273 1,324,150
kWh
Electricity Demand $47,459 3,774
kW-mo/yr
Electricity Fees $1,279 -
Natural Gas $7,482 1,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $4,723 $500 - - $4,723
-
MMBtu
- -
02 2.7231: Use radiant heater for spot heating $3,506 $2,000 $1,270
30,188
kWh
$423
-
kW-mo/yr
$1,813
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $807 $646 $495
11,723
kWh
$312
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $1,466 $2,040 $1,068
25,498
kWh
$398
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,416 $1,614 $929
22,274
kWh
$487
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $867 $450 $571
13,775
kWh
$296
-
kW-mo/yr
- - -
07 3.4115: Recover and reuse cooling water $1,453 $2,410 - - - $1,453
-
Tgal
-
08 4.444: Install system to collect scrap $22,068 $8,700 - - - - $22,068
TOTAL RECOMMENDED $36,306 $18,360 $4,333
103,458
kWh
$1,916
-
kW-mo/yr
$6,536
-
MMBtu
$1,453
-
Tgal
$22,068
TOTAL IMPLEMENTED $6,375 $6,024 $2,199
52,462
kWh
$910
-
kW-mo/yr
$1,813
-
MMBtu
$1,453
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs