ITAC Assessment: BD0116
ITAC logo
ITAC Assessment: BD0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ductile Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 40,400
ft2
Annual Production 1,200
ton
Production Hrs. Annual 4,498
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,686 4,477,140
kWh
Electricity Demand $104,604 19,745
kW-mo/yr
Electricity Fees $7,790 -
Natural Gas $64,933 14,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7231: Use radiant heater for spot heating $11,925 $16,000 $515
18,757
kWh
$81
-
kW-mo/yr
$11,329
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $8,030 $1,000 - - $8,030
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $1,993 $4,850 $1,451
51,290
kWh
$542
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $1,196 $500 $920
32,532
kWh
$276
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $638 $550 $463
16,413
kWh
$175
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $309 $294 $225
7,913
kWh
$84
-
kW-mo/yr
- - -
07 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) $22,180 $14,000 - - - $22,180
-
lb
-
08 3.5316: Contract a wood pallet recycling company $1,494 $240 - - - $1,494
-
lb
-
09 4.122: Develop standard procedures to improve internal yields $3,335 $1,200 - - - - $3,335
10 4.122: Develop standard procedures to improve internal yields $1,150 $400 - - - - $1,150
TOTAL RECOMMENDED $52,250 $39,034 $3,574
126,905
kWh
$1,158
-
kW-mo/yr
$19,359
-
MMBtu
$23,674
-
lb
$4,485
TOTAL IMPLEMENTED $16,061 $22,194 $3,574
126,905
kWh
$1,158
-
kW-mo/yr
$11,329
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs