ITAC Assessment: BD0113
ITAC logo
ITAC Assessment: BD0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Coated Steel Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 70,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,159 896,542
kWh
Electricity Demand $5,322 2,256
kW-mo/yr
Electricity Fees $1,144 -
Natural Gas $132,677 35,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2514: Cover open tanks $3,808 $1,100 n/a - - $3,808
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $2,213 $4,250 n/a $1,683
44,549
kWh
$530
-
kW-mo/yr
- - -
03 2.1213: Direct warmest air to combustion intake $2,124 $1,500 n/a - - $2,124
-
MMBtu
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,538 $3,000 n/a $1,738
48,652
kWh
$398
-
kW-mo/yr
$(-598.0)
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $768 - n/a $542
14,361
kWh
$226
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $548 $400 n/a $382
10,258
kWh
$166
-
kW-mo/yr
- - -
07 3.1191: Change procedures / equipment / operating conditions $4,349 $1,250 n/a - - - $4,349
-
lb
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $480 $250 n/a - - - - $480
09 4.821: Pay bills on time to avoid late fees $1,040 - n/a - - - - $1,040
TOTAL RECOMMENDED $16,868 $11,750 $4,345
117,820
kWh
$1,320
-
kW-mo/yr
$5,334
-
MMBtu
$4,349
-
lb
$1,520
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs