ITAC Assessment: BD0112
ITAC logo
ITAC Assessment: BD0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Concrete Panels
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 59,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 3,510
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,609 681,125
kWh
Electricity Demand $36,939 3,028
kW-mo/yr
Electricity Fees $425 -
Natural Gas $90,318 23,053
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $20,275 $1,000 $9,805
233,880
kWh
$25,620
-
kW-mo/yr
- - $(-15,150.0)
02 2.1213: Direct warmest air to combustion intake $5,254 $12,000 - - $5,254
-
MMBtu
- -
03 2.7135: Install occupancy sensors $1,019 $825 $499
12,016
kWh
$520
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $900 $650 $569
13,482
kWh
$296
-
kW-mo/yr
- - $35
05 2.7142: Utilize higher efficiency lamps and/or ballasts $266 $230 $112
2,638
kWh
$44
-
kW-mo/yr
- - $110
06 3.5316: Contract a wood pallet recycling company $5,558 $350 - - - $5,558
-
lb
-
07 3.5212: Regrind, reuse, or sell scrap plastic parts $694 - - - - - $694
08 4.423: Move product using mechanical means $46,800 $90,000 - - - - $46,800
TOTAL RECOMMENDED $80,766 $105,055 $10,985
262,016
kWh
$26,480
-
kW-mo/yr
$5,254
-
MMBtu
$5,558
-
lb
$32,489
TOTAL IMPLEMENTED $6,848 $12,650 $569
13,482
kWh
$296
-
kW-mo/yr
$5,254
-
MMBtu
- $729
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs