ITAC Assessment: BD0086
ITAC logo
ITAC Assessment: BD0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Machine Tool Protection Equipment
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 57,500
ft2
Annual Production 5,300
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,983 732,122
kWh
Electricity Demand $30,998 2,512
kW-mo/yr
Electricity Fees $2,839 -
Natural Gas $11,401 2,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $2,412 $2,845 - - $2,412
-
MMBtu
- - -
02 2.6218: Turn off equipment when not in use $1,569 $1,500 - - $1,569
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,196 $520 $1,196
36,342
kWh
- - - - -
04 2.7135: Install occupancy sensors $1,024 $750 $397
12,016
kWh
$627
-
kW-mo/yr
- - - -
05 2.7496: Install partitions to reduce size of conditioned space $904 $750 - - $904
-
MMBtu
- - -
06 2.4133: Use most efficient type of electric motors $859 $2,750 $393
12,016
kWh
$466
-
kW-mo/yr
- - - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $12,554 $14,000 - - - - $7,708 $4,846
08 3.7131: Use a rag recycle service $1,404 - - - - - - $1,404
09 4.445: Install equipment to move product $18,750 $4,000 - - - $18,750 - -
TOTAL RECOMMENDED $40,672 $27,115 $1,986
60,374
kWh
$1,093
-
kW-mo/yr
$4,885
-
MMBtu
$18,750 $7,708 $6,250
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs