ITAC Assessment: BD0069
ITAC logo
ITAC Assessment: BD0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Commercial Cleaning Equipment
NAICS
n/a
SIC 3698:
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 112,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,882 1,665,592
kWh
Electricity Demand $64,512 5,281
kW-mo/yr
Electricity Fees $701 -
Natural Gas $44,416 13,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $5,002 $3,225 $2,708
77,960
kWh
$2,294
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $4,228 $4,228 $2,495
71,805
kWh
$1,733
-
kW-mo/yr
- - -
03 2.4226: Use / purchase optimum sized compressor $2,652 $2,000 $2,652
76,202
kWh
- - - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $2,520 $1,950 - - $2,520
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,744 $3,591 $887
25,498
kWh
$857
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $631 $400 $631
18,171
kWh
- - - -
07 3.4115: Recover and reuse cooling water $2,159 $3,500 - - - $(-500.0) $2,659
-
Tgal
TOTAL RECOMMENDED $18,936 $18,894 $9,373
269,636
kWh
$4,884
-
kW-mo/yr
$2,520
-
MMBtu
$(-500.0) $2,659
-
Tgal
TOTAL IMPLEMENTED $4,396 $5,591 $3,539
101,700
kWh
$857
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs