ITAC Assessment: BD0044
ITAC logo
ITAC Assessment: BD0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Package partitions
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 61,800
ft2
Annual Production 8,400
ton
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,743 1,557,444
kWh
Natural Gas $8,160 2,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $7,319 $10,060 n/a $7,319
99,355
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,809 $675 n/a $6,809
92,321
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,917 $754 n/a $2,917
39,566
kWh
04 2.7135: Install occupancy sensors $468 $300 n/a $468
6,155
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $433 $480 n/a $433
5,862
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $146 $68 n/a $146
2,052
kWh
TOTAL RECOMMENDED $18,092 $12,337 $18,092
245,311
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs