ITAC Assessment: BD0024
ITAC logo
ITAC Assessment: BD0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Commercial Offset Prints
NAICS
n/a
SIC 2751:
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 29,030
ft2
Annual Production 60,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,228 718,347
kWh
Natural Gas $7,438 1,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,242 $3,430 $3,242
26,671
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $333 $20 $333
2,638
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $246 $160 $246
2,052
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $1,531 $997
8,206
kWh
TOTAL RECOMMENDED $4,818 $5,141 $4,818
39,567
kWh
TOTAL IMPLEMENTED $3,575 $3,450 $3,575
29,309
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs