ITAC Assessment: BD0021
ITAC logo
ITAC Assessment: BD0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Labels
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 117,216
ft2
Annual Production 200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $427,155 8,457,796
kWh
Natural Gas $156,656 44,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,801 $5,910 $3,801
77,667
kWh
-
02 2.6218: Turn off equipment when not in use $286 $250 $286
5,862
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,524 $20 - $6,524
-
MMBtu
04 2.6214: Shut off pilots in standby equipment $52 $20 - $52
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,119 $1,064 $2,119
43,376
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $5,041 $552 $5,041
103,165
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $186 $285 $186
3,810
kWh
-
TOTAL RECOMMENDED $18,009 $8,101 $11,433
233,880
kWh
$6,576
-
MMBtu
TOTAL IMPLEMENTED $11,565 $572 $5,041
103,165
kWh
$6,524
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs