ITAC Assessment: BD0016
ITAC logo
ITAC Assessment: BD0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Slag Pot Carriers, Coal Haulers
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 118,194
ft2
Annual Production 50
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,861 1,742,966
kWh
Natural Gas $32,117 14,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,461 $5,627 n/a $4,461
64,771
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,222 $600 n/a $1,222
17,878
kWh
-
03 2.2437: Recover waste heat from equipment $1,583 $3,000 n/a - $1,583
-
MMBtu
04 2.2531: Re-size charging openings or add movable cover or door $1,362 $5,900 n/a - $1,362
-
MMBtu
TOTAL RECOMMENDED $8,628 $15,127 $5,683
82,649
kWh
$2,945
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs