ITAC Assessment: AT0119
ITAC logo
ITAC Assessment: AT0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOBILE CONSTRUCTION EQUIPMENT
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,617 478,019
kWh
Natural Gas $8,274 1,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39 $54 $39
879
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $215 $40 $215
4,103
kWh
-
03 2.2514: Cover open tanks $640 $200 - $640
-
MMBtu
TOTAL RECOMMENDED $894 $294 $254
4,982
kWh
$640
-
MMBtu
TOTAL IMPLEMENTED $894 $294 $254
4,982
kWh
$640
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs