Assessment Year | 1988 |
---|---|
Principal Product | UPHOLSTERY & BEDSPREADS |
NAICS |
n/a
|
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $10 M to 50M |
# of Employees | 232 |
Plant Area |
n/a
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,610 | 3,936,401 |
kWh
|
$0.058 |
Natural Gas | $318,794 | 76,527 |
MMBtu
|
$4.17 |
Fuel Oil #2 | $21,402 | 6,370 |
MMBtu
|
$3.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $129,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $124,949 | $261,000 | - |
$107,249
-
MMBtu
|
$17,700
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $770 | $130 | - |
$659
-
MMBtu
|
$111
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $281 | $200 | - |
$241
-
MMBtu
|
$40
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,922 | $1,817 |
$2,922
50,703
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $419 | $746 |
$419
7,327
kWh
|
- | - | |
06 | 2.4312: Improve lubrication practices | $1,829 | - |
$1,829
31,653
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $884 | - |
$884
15,240
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $336 | $150 |
$336
6,155
kWh
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,275 | $3,000 |
$1,275
22,274
kWh
|
- | - | |
TOTAL RECOMMENDED | $133,665 | $267,043 |
$7,665
133,352
kWh
|
$108,149
-
MMBtu
|
$17,851
-
MMBtu
|
||
TOTAL IMPLEMENTED | $129,468 | $262,226 |
$3,468
60,375
kWh
|
$108,149
-
MMBtu
|
$17,851
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs